A groundbreaking ceremony was held October 2 for Lahaina Residential, a 60-home community on Front Street destroyed in the 2023 wildfire. Construction begins October 19 and is expected to take about 18 months.
- Maui-based Arita Poulson General Contracting will manage the rebuild of six two-story residential buildings at 1034 Front St.
- Construction is scheduled to start October 19, 2026, with completion expected in approximately 18 months.
- Rebuilt homes will feature fire-resistant materials, defensible space, fire-safe landscaping, water-saving fixtures, and EV charger infrastructure.
- The site sits within the LΔhainΔ Historic District, and designers coordinated with county historic representatives to ensure compatibility with the area.
- When complete, the project will return 60 housing units to local West Maui residents.
Source: Yahoo
Share this article
